Page 173 - Modul CA - Akuntansi Manajemen Lanjutan (Plus Soal)
P. 173

AKUNTANSI MANAJEMEN LANJUTAN







               22.  A
                                              Tahun Berjalan  Tahun Lalu      Perubahan
                    Prevention                0.15%           0.10%           -0.05%          Naik (control)

                    Appraisal                 1.40%           0.75%           -0.65%
                    Internal Failure          4.00%           6.00%           2.00%           Turun (Failure)
                    External Failure          2.75%           3.50%           0.75%
                                              8.30%           10.35%          2.05%
                    Kenaikan Laba = 2.05% * 2.000.000 = 41.000 (Naik)
               23.  C
                   Budget Produksi = Budget Penjualan + sediaan akhir – sediaan awal
                   Budget Produksi = 50.000 + 8000 – 4000 = 54.000
               24.  B
                   Budget Produksi = 54.000
                   Kebutuhan untuk produksi = 54.000 * 4 kg = 216.000 kg
                   Jumlah Dibeli = 216.000 + 3.000 – 12.000 = 207.000 kg
                   Anggaran Biaya Pembelian = 207.000 x Rp6.000 = Rp1.242.000.000
               25.  D
               26.  B
               27.  A
                    Activities  DOKUMEN
                                                               SP
                                               SQ
                                                                                SQxSP
                    Sewing cost                150.000         Rp15             Rp2.250.000
                    Stretching cost            140.000         Rp10             1.400.000
                    Mending cost               0               Rp8              0
                    Setup cost                 0     IAI                        0
                                                               Rp100
                    Inspection cost            0               Rp12             0
                    Jumlah biaya dilaporkan                                     Rp3.650.000
               28.  D
               29.  C
                   Ketika BEP = FC = CM, jadi Fixed costs = Rp600,000
                   Total variable costs = Rp1,050,000 - Rp90,000 - Rp600,000 = Rp360,000
                   Variable cost per unit = Rp360,000/30,000 unit = Rp12 per unit
               30.  C
                   Dalam kondisi BEP, FC = Margin Contribution, jadi
                   FC = Rp20 x 2000 = Rp40.000
                   Dengan demikian: BEP = (Rp40.000 + Rp45.000) / Rp20 = 4250 unit

























                                                                                    Ikatan Akuntan Indonesia     165
   168   169   170   171   172   173   174   175   176